ACT Pedestrian Lighting Upgrade

ACT Pedestrian Lighting Upgrade

Work Summary:

NDD was engaged by Affinity Electrical to excavate and install 50mm electrical conduits at 19 separate sites around Canberra for the installation of pedestrian lighting.

  • 2 poles per site
  • Auger holes for installation
  • Widely spread out job site
  • Technically demanding

Key Outcomes:

NDD had to overcome some hurdles, with many site’s not always close together and with every site being extremely close to live traffic and in close proximity to existing services, some extremely fragile. NDD was able to overcome all hurdles, with the ability to utilise all methods of installation in house. Being directional drilling, grundomat, hydro excavation, open cut trenching and bed boring. Had NDD not have had this all in house the project time frame and budget would have been compromised.

  • Many methods utilised in house
  • Proximity to live traffic
  • On time and budget